Today I’ll run the numbers for a recently announced PV plant in La Paz, Mexico.  Stories on the plant are available here (RenewEconomy) and here (Thomson Reuters).

La Paz is the state capital of Baja California Sur and is situated on La Paz Bay at the southern end of the Baja California peninsula.  La Paz is said to be a beautiful town, with tourism playing a major part in the regional economy.

Thomson Reuters says La Paz “suffers from the pollution pumped out by the aging Punta Prieta thermoelectric plant, which uses some of the dirtiest petroleum products on earth: a mix of cheap, low-grade fuel oil and expensive high-sulfur diesel.” 

This is clearly a case that’s crying out for installation of clean solar energy. 

Thomson Reuters goes on to say that “Mexico’s energy ministry has set a target for 35 percent of the country’s energy output to come from clean sources by 2024.”  


(For international readers, I point out that Australia has a target for 41,000 TWh of its electricity generation to come from renewable sources by 2020.  When announced a few years back, it was equivalent to 20% of the national production; now with declining demand it will probably be about 25% of the national production in 2020.  It is widely believed that this target will be revised downwards in a current review by the federal government.)

Aura Solar I is Mexico’s first major installation and began operation in September 2013.  The peak output from the 100 Ha site will be 30 MW.  The project involves 132,000 solar panels from Suntech and has a total cost of USD 100 million.

So we know the cost and the peak output.  What about the annual production?  As is often the case, this figure is not readily available, so I’ll estimate it in two ways.

Thomson Reuters say the plant will involve CO2 emissions savings of 60,000 t per year.  At an emissions intensity of 0.9 t per MWhr, I make that 60,000/0.9 = 66,667 MWh per year. Alternatively we can estimate a reasonable capacity factor for fixed panels at this excellent site, say 22%, which gives annual output of 24 × 365 × 30 × 0.22 = 57,816 MWh per year.  As is usually the case, the two estimates don’t agree exactly, so I’ll use the nice round number of 60,000 MWh per year.

I’ll analyse the Levelised Cost of Electricity (LCOE) for the La Paz project using my standard assumptions:



  • there is no inflation,
  • taxation implications are neglected,  
  • projects are funded entirely by debt,  
  • all projects have the same interest rate (8%) and payback period (25 years), which means that the required rate of capital return is 9.4%,  
  • all projects have the same annual maintenance and operating costs (2% of the total project cost), and 
  • government subsidies are neglected.
For further commentary on my LCOE methodology, see posts on Real cost of coal-fired power, LEC – the accountant’s view, Cost of solar power (10) and (especially) Yet more on LEC.  Note that I am now using annual maintenance costs of 2% rather than 3% as in posts during 2011.

The results for La Paz are as follows:


Cost per peak Watt              USD 3.33/Wp
LCOE                                     USD 190/MWh


The components of the LCOE are:
Capital           {0.094 × USD 1 × 10^8 }/{60,000 MWhr} = USD 157/MWhr
O&M              {0.020 × USD 1 × 10^8 }/{60,000 MWhr} = USD 33/MWhr


By way of comparison, LCOE figures (in appropriate currency per MWh) for all projects I’ve investigated are given below.  The number in brackets is the reference to the blog post, all of which appear in my index of posts with the title “Cost of solar power ([number])”:


(2)        AUD 183 (Nyngan, Australia, PV)
(3)        EUR 503 (Olmedilla, Spain, PV, 2008)
(3)        EUR 188 (Andasol I, Spain, trough, 2009)
(4)        AUD 236 (Greenough, Australia, PV)
(5)        AUD 397 (Solar Oasis, Australia, dish, 2014?)
(6)        USD 163 (Lazio, Italy, PV)
(7)        AUD 271 (Kogan Creek, Australia, CLFR pre-heat, 2012?)
(8)        USD 228 (New Mexico, CdTe thin film PV, 2011)
(9)        EUR 200 (Ibersol, Spain, trough, 2011)
(10)      USD 231 (Ivanpah, California, tower, 2013?)
(11)      CAD 409 (Stardale, Canada, PV, 2012)
(12)      USD 290 (Blythe, California, trough, 2012?)
(13)      AUD 285 (Solar Dawn, Australia, CLFR, 2013?)
(14)      AUD 263 (Moree Solar Farm, Australia, single-axis PV, 2013?)
(15)      EUR 350 (Lieberose, Germany, thin-film PV, 2009)
(16)      EUR 300 (Gemasolar, Spain, tower, 2011)
(17)      EUR 228 (Meuro, Germany, crystalline PV, 2012)
(18)      USD 204 (Crescent Dunes, USA, tower, 2013)
(19)      AUD 316 (University of Queensland, fixed PV, 2011)
(20)      EUR 241 (Ait Baha, Morocco, 1-axis solar thermal, 2012)
(21)      EUR 227 (Shivajinagar Sakri, India, PV, 2012)
(22)      JPY 36,076 (Kagoshima, Kyushu, Japan, PV, start July 2012)
(23)      AUD 249 (NEXTDC, Port Melbourne, PV, Q2 2012)
(24)      USD 319 (Maryland Solar Farm, thin-film PV, Q4 2012)
(25)      EUR 207 (GERO Solarpark, Germany, PV, May 2012)
(26)      AUD 259 (Kamberra Winery, Australia, PV, June 2012)
(27)      EUR 105 (Calera y Chozas, PV, Q4 2012)
(28)      AUD 205 (Nyngan and Broken Hill, thin film PV, end 2014?)
(29)      AUD 342 (City of Sydney, multiple sites, PV, 2012)
(30)      AUD 281 (Uterne, PV, single-axis tracking, 2011)
(31)      JPY 31,448 (Oita, PV?, Japan, to open March 2014)
(32)      USD 342 (Shams, Abu Dhabi, trough, to open early 2013)
(34)      USD 272 (Daggett, California, designed 2010)
(35)      GBP 148 (Wymeswold, UK, PV, March 2013)
(36)      USD 139 (South Georgia, PV, June 2014)
(37)      USD 169 (Antelope Valley, CdTe Pv, end 2015)
(38)      AUD 137 (Mugga Lane, PV, mid 2014)
(39)      AUD 163 (Coree, fixed PV, Feb 2015)
(40)      AUD 298 (Ferngrove Winery, July 2013)
(41)      USD 125 (Cerro Dominador, mid 2017)
(42)      USD 190 (La Paz, PV, September 2013)





Conclusion

These LCOE numbers are good, but not the best in the world.  They are perhaps 5-10% higher than other recent big projects such as Antelope Valley (number 37) and Coree (number 39).

Over the weekend I’ll update my graphic that features all the above LCOE figures.






 